About

FSG-NEC is an independent noise & environmental control company. Our work embraces acoustic and environmental consultancy, acoustic design and manufacturer,industrial and architectural acoustics, the monitoring and control of vibrations.

FSG-NEC

Whether you are a company or a private individual, we are here to advise and guide you.If you would like to learn more about the services we offer, please send an email to info@fsgnec.com.my or give us a ring.

Get in Touch
open

DOE Submission

  Home/DOE Submission
 

DOESubmission

Scope of Consultation Work

Provision of PE engineering design and drawing for the design of one lot of local exhaust ventilation system according to DOSH’s & DOE’s regulation and requirement. Submission of Written Notification, Written Declaration and As-built drawing as required by DOE regulation below:

 

Under regulation 7 (1) of the Environmental Quality (Clean Air) Regulation, 2014, every premise shall be equipped with an air pollution control system in accordance to the specifications as determined by the Director General.

 

Under regulation 5 of the Environmental Quality (Clean Air) Regulation, 2014, the industry is required to do ‘written notification’ to the department of environmental prior to the implementation or installation of the following:

Written notification on air emission sources  (fuel burning equipment-generator etc)

Written notification on air emission sources (incinerator)

Written notification on air emission source  (Air Pollution Control System (Scrubber))

Written notification on air emission source  (Air Pollution Control System (Bag Filter))

Written notification on air emission source (Air Pollution Control System (Centrifugal Dust Collector))

Written notification on air emission source (Air Pollution Control System (Spray booth))

Written notification on air emission source (Air Pollution Control System (ESP))

Written notification on installation of exhaust / vent.

 

Under regulation 7 (2) of the Environmental Quality (Clean Air) Regulation, 2014, an owner or occupier of the premises shall appoint a professional engineer to design and supervise the construction of the air pollution control system.

 

Under regulation 7 (5) of the Environmental Quality (Clean Air) Regulation, 2014, the owner or occupier of the premises and the professional engineer shall, within thirty days after the commencement of the operations at the premises, submit a written declaration to the Director General, in such form as determined by the Director General, certifying that the design and construction of the air pollution control system have complied with the specifications referred to in sub-regulation (1).

 

Under regulation 7 (6) of the Environmental Quality (Clean Air) Regulation, 2014, the owner or occupier of the premises shall, within thirty days after the commencement of the operations at the premises, submit to the Director General, as-built drawings that show the placement of any works or structures that form part of the air pollution control system.

 

DocumentReferences

AS_PUB_N-APB-PEMBERITAHUAN-BERTULISAPB-WRITTEN-NOTIFICATIONFBE

AS_PUB_N-CYCLONE-PEMBERITAHUAN-BERTULISCYCLONE-WRITTEN-NOTIFICATION CYCLONE

AS.PUB_.N-BAGFILTER-PEMBERITAHUAN-BERTULIS-PENAPIS-BEG-WRITTEN-NOTIFICATION-BAG-FILTER